Product Detail :
|
Proposed supplying and stacking of machine crushed ballast from outside quarry as per revised ballast specification of june 2016 and loading the same into the ballast hoppers by mechanical means for deficiency of ballast in track between itarsi-amla section at amla depot under aden amla sun division (quantity = 78840 m3).
|